Extension Cost Calculator

Comprehensive Guide to Accurate Project Budgeting | ashton-paul.co.uk | 07736 733326

How to Use This Calculator Fill in your project dimensions and preferences, then add up totals for your overall budget. Based on 2025 London rates. Always add 10-15% contingency.
1. Project Overview & Rate Guide
Project Details Your Project Notes
Extension Type _____________ Single/Two storey/Loft
Length × Width (m) _____ × _____
Total Area (m²) _____________ Length × Width
⚠️ Rate Guide (Per m²): Budget: £2,500/m² | Mid-Range: £3,000/m² | High-End: £3,500/m² | Premium: £4,000+/m²
2. Detailed Cost Breakdown by Trade
Trade / Item Rate Guide Your Cost Notes
Groundworks & Foundations£5,000-£12,000£______Varies w/ ground
Structural Work£3,000-£8,000£______Steels, RSJs, calcs
Bricklaying & Blockwork£150-£200/m²£______External walls
Carpentry & Joinery£4,000-£10,000£______1st/2nd fix, roof
Roofing£3,000-£8,000£______Flat/pitched
Windows & Doors£500-£1,500 ea£______Qty: ___
Plastering£15-£25/m²£______Walls & ceilings
Electrical£100/point£______See Section 4
Plumbing & Heating£3,000-£6,000£______Rads, pipes, boiler
Kitchen£15,000-£30,000£______See Section 3
Flooring£30-£100/m²£______Tiles/wood/UFH
Decorating£1,500-£3,000£______Painting, finishing
Building Control Fees£800-£1,500£______Statutory
Planning Fees£206-£462£______If required
Architect/Designer5-10% of build£______Design & drawings
Party Wall Agreement£700-£2,000£______If applicable
Skip Hire & Waste£300-£600/wk£_________ weeks
Scaffolding£800-£1,500/mo£______If required
SUBTOTAL£______
Contingency (10-15%)Essential£______Subtotal × 15%
TOTAL PROJECT COST£______
3. Kitchen Cost Calculator
⚠️ Budget Trap: Builders often allocate £10-15k for kitchens. Realistic modern kitchens cost £21-35k+.
ComponentRangeYour Cost
Base Units (£200-£600 ea) × Qty: ___£______
Wall Units (£150-£500 ea) × Qty: ___£______
Worktops: Laminate £50-100/m | Wood £150-300/m | Granite/Quartz £250-500/m___ m£______
Sink & Tap£300-£1,500£______
Appliances
Oven£400-£2,000£______
Hob£300-£1,500£______
Extractor Fan/Hood£200-£1,000£______
Dishwasher£300-£1,200£______
Fridge/Freezer£500-£2,500£______
Washing Machine£300-£800£______
Microwave£100-£500£______
Installation & Fitting£2,000-£4,000£______
Splashback/Tiling£500-£2,000£______
TOTAL KITCHEN COST£______
4. Electrical Points Calculator
⚠️ Budget Trap: 50 points quoted? Modern kitchen-diners need 80-100+ points. At £100/point = £3-5k shortfall!
Room/AreaTypicalYour Count
KITCHEN ZONE
Appliance sockets (oven, hob, extractor, etc.)6-8______
Worktop sockets (kettle, toaster, mixer, etc.)8-12______
Under-counter sockets (dishwasher, fridge, etc.)4-6______
Under-cabinet lighting circuits3-5______
Ceiling downlights (LED spots)8-15______
Pendant/feature lighting1-3______
Light switches (inc dimmers)3-5______
DINING/GENERAL
Dining area sockets & lighting5-8______
Wall lights/lamps & switches4-7______
USB charging points2-4______
TV/entertainment sockets2-4______
Outdoor sockets, smoke detectors, UFH controls, misc4-8______
TOTAL POINTS70-100+______
Cost per point£80-£120£______
TOTAL ELECTRICAL COST£______
5. Material Specification Checklist

Ensure every detail is specified before requesting builder quotes:

External Materials

Internal Structure

Internal Finishes

Kitchen

Electrical

Plumbing & Heating

External Works

6. Provisional Sums: Warning Guide

Provisional sums are placeholders when you haven't specified exact products. Major source of budget overruns.

ItemTypical ProvisionalRealistic CostShortfall Risk
Kitchen£10-15k£21-35k£6k-£20k
Electrics£3-5k (50pts)£8-10k (80-100pts)£3k-£5k
Flooring£1.5-2k£2.5-4k£1k-£2k
Bathroom£3-5k£6-12k£3k-£7k
Windows/Doors£2-3k£4-8k£2k-£5k
TOTAL SHORTFALL RISK£15k-£39k
⚠️ Actions: (1) Request detailed breakdown of all provisional sums (2) Ask what's included/excluded (3) Get actual costs BEFORE accepting quote (4) Add 20% buffer on unspecified provisionals (5) Specify everything possible to eliminate provisional sums
7. Contingency Planning Worksheet
Potential Additional CostsProbabilityYour Budget
HIGH PROBABILITY (60-90%)
Unforeseen ground conditions (tree roots, old foundations)60-80%£______
Additional structural work during demolition50-70%£______
Building control additional requirements40-60%£______
Design changes requested during build70-90%£______
MEDIUM PROBABILITY (20-50%)
Services relocation (gas, electric, water mains)30-50%£______
Drainage issues or connection upgrades30-50%£______
Party wall complications/delays20-40%£______
Weather delays (winter builds)40-60%£______
Material price increases during project30-50%£______
LOW PROBABILITY (1-20%) - HIGH COST IF OCCURS
Asbestos discovery & removal10-20%£______
Archaeological findings / Neighbour disputes / Major structural defects1-10%£______
TOTAL CONTINGENCY BUDGET£______
💡 Contingency Rules: Minimum 10% (well-specified) | Recommended 15% (typical extensions) | Higher-risk 20-25% (older properties) | Loft conversions 15-20%
Total Build Cost (from Section 2)£____________
Contingency % (10-15% recommended)________%
RECOMMENDED CONTINGENCY£____________
TOTAL PROJECT BUDGET (Build + Contingency)£____________
8. Your Action Plan

Phase 1: Design & Planning (Weeks 1-8)

Phase 2: Detailed Design (Weeks 9-16)

Phase 3: Procurement (Weeks 17-20)

Phase 4: Construction (Weeks 21-32)

💡 Prefer All-in-One? Ashton Paul's design & build service handles everything. 37 years experience. Fixed-price contracts, no hidden costs, full specification included, single contact throughout, accurate costs from day one. 📞 07736 733326 | 🌐 ashton-paul.co.uk/book